Violation Detail
Standard Cited: 19100147 F01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1565182.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/03/2022 2
Initial Penalty: $8,806.00
Current Penalty: $6,500.00
Issuance Date: 04/14/2022
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 05/09/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/09/2022 | $6,500.00 | 05/03/2022 | Serious | |
| Penalty | Z: Issued | 04/14/2022 | $8,806.00 | 05/03/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(f)(1):When lockout or tagout devices temporarily were removed from the energy isolating device and the machine or equipment was energized to test or position the machine, equipment or component thereof, the sequence of actions required by this paragraph were not followed: a) Production floor, Hess Machine RH2000 - On or about November 15, 2021, when trouble shooting the machine required it to be energized, employees were not removed from the danger zone before it was re-energized.
Translate