Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1561048.015
Citation: 01001C
Citation Type: Other
Abatement Date: 04/26/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/31/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0317500
Contest Date:
Final Order: 04/22/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/22/2022 | $0.00 | 04/26/2022 | Other | |
| Penalty | Z: Issued | 03/31/2022 | $0.00 | 04/26/2022 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner so as to isolate the machine or equipment from the energy source(s): Instances including, but not limited to, the following: a) Job site, 111 Marvista Street, Pittsburgh, PA: On or about October 25, 2021, during work such as jam clearing activities on Folder 3, unit number 5051076/98, the employer did not ensure that all energy isolating devices were located and operated in such a manner as to shut power off to the machinery.