Violation Detail
Standard Cited: 19260417 B Lockout and tagging of circuits.
Inspection Nr: 1557066.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 05/11/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/05/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 04/26/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/26/2022 | $0.00 | 05/11/2022 | Serious | |
Penalty | Z: Issued | 04/05/2022 | $0.00 | 04/15/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.417(b): Equipment or circuits that were de-energized did not have tags attached at all points where such equipment or circuits could be energized. On or about October 8, 2021, employees performing electrical wire installment for a water heater were exposed to energized circuits in that, circuits to be de-energized were not tagged.