Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 1552263.015
Citation: 01025
Citation Type: Other
Abatement Date: 02/28/2024 2
Initial Penalty: $11,396.00
Current Penalty: $3,400.00
Issuance Date: 03/04/2022
Nr Instances: 3
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date: 03/30/2022
Final Order: 03/15/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/15/2024 | $3,400.00 | 02/28/2024 | Other | |
Penalty | C: Contested | 04/04/2022 | $11,396.00 | 03/30/2022 | Serious | |
Penalty | Z: Issued | 03/04/2022 | $11,396.00 | 03/30/2022 | Serious |
Text For Citation: 01 Item/Group: 025 Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) J Building inside of line one station 10: The 480 volt control panel used to operate the Mohawk vehicle lift was dented and secured to the post using a bungee cord, on or about 9/9/21. b) J building inside of line two station 10: The 480 volt control panel used to operate the Mohawk vehicle lift was dented and secured to the post using a bungee cord, on or about 9/9/21. c) J building outside of line three station 10: The 480 volt control panel used to operate the Mohawk vehicle lift was dented and secured to the post using a bungee cord, on or about 9/9/21. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.