Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1551343.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/11/2022 2
Initial Penalty: $5,801.00
Current Penalty: $5,801.00
Issuance Date: 02/10/2022
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 03/07/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/07/2022 | $5,801.00 | 03/11/2022 | Serious | |
| Penalty | Z: Issued | 02/10/2022 | $5,801.00 | 03/02/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On or about August 23, 2021, in Warehouse #18; emergency exit double doors were locked closed, preventing employees from being able to exit from inside without the use of a key.
Translate