Violation Detail
Standard Cited: 19260754 E03 III Structural steel assembly.
Inspection Nr: 1548707.015
Citation: 01002
Citation Type: Serious
Abatement Date: 02/23/2022
Initial Penalty: $3,108.00
Current Penalty: $3,108.00
Issuance Date: 02/16/2022
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0214700
Contest Date: 03/10/2022
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/10/2022 | $3,108.00 | 02/23/2022 | Serious | |
Penalty | Z: Issued | 02/16/2022 | $3,108.00 | 02/23/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.754(e)(3)(iii): All covers were not painted with high-visibility paint or marked with the word "HOLE" or "COVER" to provide warning of the hazard: Instance a) Worksite, 101 Bethpage Sweet Hollow Rd., Old Bethpage, NY- While replacing metal roof panels on a commercial building, employees worked and walked near a translucent fiberglass skylight on the north side of the roof that was approximately 18'9" above the ground. The skylight was covered by a metal roof panel that the employer failed to paint with high visibility paint or mark with the word "Hole" or "Cover"; on or about 8/17/21 through 8/19/21. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.