Violation Detail
Standard Cited: 19100269 L01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1539006.015
Citation: 01002
Citation Type: Serious
Abatement Date: 01/07/2022
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 12/10/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date: 01/04/2022
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/22/2022 | $13,653.00 | 01/07/2022 | Serious | |
Penalty | Z: Issued | 12/10/2021 | $13,653.00 | 01/07/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(l)(1)(ii): Only qualified employees did not work in areas containing unguarded, uninsulated energized lines or parts of equipment operating at 50 volts or more: a) Bucket at height near phase lines: On or about June 23, 2021, a qualified employee directed an employee that was not qualified to install insulation from a position that exposed his upper arm to contact with an unguarded, uninsulated 23 kV C-phase line.