Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1538513.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 10/20/2021 2
Initial Penalty: $8,192.00
Current Penalty: $5,734.40
Issuance Date: 09/30/2021
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0936300
Contest Date:
Final Order: 10/18/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/18/2021 | $5,734.40 | 10/20/2021 | Serious | |
| Penalty | Z: Issued | 09/30/2021 | $8,192.00 | 10/20/2021 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): In the ice production room: Employees had to manually pull on an unguarded belt and pulley to start the ice bagger machine. Employees then continued their work bagging ice next to the exposed pulley and belt system. Employees were exposed to caught-in hazards.
Translate