Violation Detail
Standard Cited: 19260502 D08 Fall protection systems criteria and practices.
Inspection Nr: 1533454.015
Citation: 01003
Citation Type: Serious
Abatement Date: 11/18/2021 2
Initial Penalty: $13,516.00
Current Penalty: $13,516.00
Issuance Date: 11/12/2021
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC):
Gravity: 10
Report ID: 0215000
Contest Date: 11/24/2021
Final Order: 04/06/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/27/2023 | $13,516.00 | 11/18/2021 | Serious | |
Penalty | J: ALJ Decision | 04/06/2023 | $13,516.00 | 11/18/2021 | Serious | |
Penalty | Z: Issued | 11/12/2021 | $13,516.00 | 11/18/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two: Location: 1045 Flatbush Avenue, Brooklyn, NY 11226; Roof a) On or about 05/17/2021 and thereafter, a horizontal lifeline was not designed, installed and used under the supervision of a qualified person. Employees used the horizontal lifeline during demolition of a roof.