Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1516382.015
Citation: 01005A
Citation Type: Other
Abatement Date: 07/29/2021 2
Initial Penalty: $7,022.00
Current Penalty: $3,511.00
Issuance Date: 07/15/2021
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0936200
Contest Date: 08/04/2021
Final Order: 09/15/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/15/2022 | $3,511.00 | 07/29/2021 | Other | |
Penalty | C: Contested | 08/09/2021 | $7,022.00 | 07/29/2021 | Serious | |
Penalty | Z: Issued | 07/15/2021 | $7,022.00 | 07/29/2021 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) San Clemente Island SCORE Berthing REWS-T-108: The employer used an extension cord in the main common living area to power an overhead fixed florescent light. This condition exposed the employees to electrical shock and/or fire hazards.