Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 1514986.015
Citation: 02001
Citation Type: Other
Abatement Date: 03/30/2021 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/11/2021
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): C
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 04/06/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/06/2021 | $0.00 | 03/30/2021 | Other | |
| Penalty | Z: Issued | 03/11/2021 | $0.00 | 03/30/2021 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: a) Electric Panel ML1-2 - The employees accessing panel ML1-2 were exposed to electrical hazards from the inability to access the panel while the door to the adjacent room was open, on or about October 7, 2020. b) Main Electric Panels-The employees accessing the main electric panels were exposed to electrical hazards from the inability to access the panel without moving tables that were stored in front of them, on or about October 7, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate