Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1510477.015
Citation: 01007
Citation Type: Serious
Abatement Date: 07/27/2021 2
Initial Penalty: $6,436.00
Current Penalty: $6,436.00
Issuance Date: 07/15/2021
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0627500
Contest Date: 08/04/2021
Final Order: 03/04/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2022 | $6,436.00 | 07/27/2021 | Serious | |
Penalty | C: Contested | 08/09/2021 | $6,436.00 | 07/27/2021 | Serious | |
Penalty | Z: Issued | 07/15/2021 | $6,436.00 | 07/27/2021 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: On or February 24, 2021, on production floor at Hydraulic Press #10; the cable coming out from below the Two-Hand Palm Control Panel had its strain relief broken and outer jacket damaged. This condition exposed employees to electric shock hazards.