Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1503238.015
Citation: 01001
Citation Type: Other
Abatement Date: 11/15/2021 2
Initial Penalty: $6,963.00
Current Penalty: $6,963.00
Issuance Date: 02/19/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0418300
Contest Date: 03/17/2021
Final Order: 11/05/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 11/05/2021 | $6,963.00 | 11/15/2021 | Other | |
| Penalty | C: Contested | 03/22/2021 | $6,963.00 | 03/17/2021 | Serious | |
| Penalty | Z: Issued | 02/19/2021 | $6,963.00 | 03/17/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about November 13, 2020 - Process Building, 2nd Floor D Reactor, employees were exposed to caught-in hazards when lockout was not utilized when v-belts were replaced on the reactor D arm pulley.