Violation Detail
Standard Cited: 19100178 L02 II Powered industrial trucks.
Inspection Nr: 1498720.015
Citation: 01002
Citation Type: Other
Abatement Date: 03/15/2021 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/26/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0728900
Contest Date:
Final Order: 02/24/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 01/26/2021 | $0.00 | 03/15/2021 | Other |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.178(l)(2)(ii): The employer did not ensure that each operator had successfully completed the training consisting of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace. The employer is failing to ensure employees are protected from struck by hazards associated with PITS training of employees. This was most recently documented on or about October 20, 2020 at Kohler Industries, 4925 North 56th Street, Lincoln, Nebraska. Evaluations of the operators' performance have not been performed when administering PITS training.
Translate