Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1497407.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 04/13/2021 2
Initial Penalty: $6,827.00
Current Penalty: $5,000.00
Issuance Date: 03/18/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A;R
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 03/29/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/29/2021 | $5,000.00 | 04/13/2021 | Serious | |
| Penalty | Z: Issued | 03/18/2021 | $6,827.00 | 04/13/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry or direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work may bring any person, tool, or machine into physical or electrical contact with the electric power circuit. A.) B&B Designed Systems, Inc., 18746 Mill Street, Meadville, PA 16335, on or about September 18, 2020 and times prior thereto: An employee was removing electrical components including, but not limited to, de-energized 480-volt wiring, low-voltage control wiring and conduit. In the process of cutting the low-voltage control wiring, the employee cut through a concealed 480-volt wire that was energized. The electrical system was not metered with instrumentation to determine whether any part of an energized electric power circuit was present. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.