Violation Detail
Standard Cited: 19261101 G08 III B Asbestos
Inspection Nr: 1493558.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,096.00
Current Penalty: $1,720.32
Issuance Date: 03/15/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/08/2021
Gravity: 10
Report ID: 0214500
Contest Date: 04/16/2021
Final Order: 12/23/2021
Related Event Code (REC):
Emphasis:
Substance: 9020
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/23/2021 | $1,720.32 | 04/08/2021 | Serious | |
| Penalty | C: Contested | 04/20/2021 | $4,096.00 | 04/08/2021 | Serious | |
| Penalty | Z: Issued | 03/15/2021 | $4,096.00 | 04/08/2021 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.1101(g)(8)(iii)(B): Each panel or shingle was not sprayed with amended water prior to removal: a) Exterior Rear of Single Family Frame Home: Transite asbestos panels, containing 15% chrysotile asbestos were removed by hand, using a flat bar tool, on a two story residential home. The employer did not ensure that amended water was used prior to removing transite asbestos panels, on or about 9/15/20.
Translate