Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1493063.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 12/15/2021 2
Initial Penalty: $5,783.00
Current Penalty: $5,204.00
Issuance Date: 10/14/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 1
Report ID: 0729300
Contest Date: 11/03/2020
Final Order: 10/28/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 10/28/2021 | $5,204.00 | 12/15/2021 | Serious | |
| Penalty | C: Contested | 11/20/2020 | $5,783.00 | 12/02/2020 | Serious | |
| Penalty | Z: Issued | 10/14/2020 | $5,783.00 | 12/02/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. The S2 line lockout procedure did not include all machines that could and were worked on separately, such as on the packaging conveyor. There was no specific procedure for this particular machine, including how and where to shut it down and how to de-energize. Abatement documentation is required for this violation.