Violation Detail
Standard Cited: 19260651 B02 Specific Excavation Requirements.
Inspection Nr: 1485644.015
Citation: 01002A
Citation Type: Other
Abatement Date: 01/06/2021 2
Initial Penalty: $6,747.00
Current Penalty: $5,000.00
Issuance Date: 12/07/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0627510
Contest Date:
Final Order: 02/08/2021
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/08/2021 | $5,000.00 | 01/06/2021 | Other | |
| Penalty | Z: Issued | 12/07/2020 | $6,747.00 | 01/06/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.651(b)(2):Utility companies or owners were not contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of the utility underground installations prior to the start of trenching operations. On or about July 28, 2020, the employer failed to make the required One Call to the owner of the pipeline, the utility, nor the railroad commission to ensure that active line locations were marked and verified.
Translate