Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1485323.015
Citation: 01001
Citation Type: Serious
Abatement Date: 1
Initial Penalty: $4,387.00
Current Penalty: $3,070.90
Issuance Date: 08/19/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 09/08/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/08/2020 | $3,070.90 | Serious | ||
| Penalty | Z: Issued | 08/19/2020 | $4,387.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(f)(3): Sprockets and chains. All sprocket wheels and chains were not enclosed that were less than seven (7) feet above the floor or platform. On or about 7/10/2020, an employees from Universal Packaging Corporation were operating a flanger machine on a manufacturing line. The line had an unguarded chain and sprocket adjacent to a flanger machine. The sprocket and chain were less than seven feet above the floor.