Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1484741.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/28/2020 2
Initial Penalty: $11,566.00
Current Penalty: $6,939.60
Issuance Date: 10/08/2020
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): A
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 10/29/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/29/2020 | $6,939.60 | 10/28/2020 | Serious | |
| Penalty | Z: Issued | 10/08/2020 | $11,566.00 | 10/28/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about July 15, 2020 and at times prior thereto, a periodic inspection of the energy control procedures for equipment that contains hazardous energy to including, but not limited to, the Repak Machine, was not completed on an annual basis, exposing employees to the hazards of unexpected start-up of energy sources.
Translate