Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1482899.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/16/2020 2
Initial Penalty: $13,494.00
Current Penalty: $8,100.00
Issuance Date: 10/06/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 11/03/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/03/2020 | $8,100.00 | 10/16/2020 | Serious | |
| Penalty | Z: Issued | 10/06/2020 | $13,494.00 | 10/16/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: On or about July 7, 2020 the light curtain guarding that was set-up in accordance with the employers� operating procedures for PB 33 did not adequately protect the operator from exposure to the point of operation when the operator engauged in inadvertent and unexpected activation of the equipment.
Translate