Violation Detail
Standard Cited: 19260454 B02 Training requirements.
Inspection Nr: 1478762.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 09/23/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/17/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0214700
Contest Date:
Final Order: 10/16/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 09/17/2020 | $0.00 | 09/23/2020 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.454(b)(2): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the top, 13' level of a scaffold while spackling a cathedral ceiling in a residence. The top level had only one plank and there were no guardrails; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.