Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1478762.015
Citation: 01001
Citation Type: Serious
Abatement Date: 09/23/2020 2
Initial Penalty: $4,048.00
Current Penalty: $4,048.00
Issuance Date: 09/17/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0214700
Contest Date:
Final Order: 10/16/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 09/17/2020 | $4,048.00 | 09/23/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the top level of a scaffold while spackling a cathedral ceiling in a residence. The top level had only one plank; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Translate