Violation Detail
Standard Cited: 19100217 C02 I B Mechanical power presses.
Inspection Nr: 1478350.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 12/31/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/09/2020
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 10/09/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/09/2020 | $0.00 | 12/31/2020 | Serious | |
| Penalty | Z: Issued | 09/09/2020 | $0.00 | 10/27/2020 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.217(c)(2)(i)(b): Point of operation guard(s) on mechanical power press(es) did not conform to the maximum permissible opening(s) specified in Table O-10: In the following locations, barrier guards provided on mechanical power presses had openings that exceeded the maximum allowed in Table O-10 of 29 CFR 1910.217: A. 370 Riverside Avenue, Rear, Bristol, Connecticut: On, or about, July 9, 2020, Press #30, Perkins. B. 400 Riverside Avenue, Bristol, Connecticut: On, or about, July 16, 2020, Press #27, Bliss.