Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1477218.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/28/2020 2
Initial Penalty: $4,048.00
Current Penalty: $2,024.00
Issuance Date: 08/04/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 08/28/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/28/2020 | $2,024.00 | 08/28/2020 | Serious | |
| Penalty | Z: Issued | 08/04/2020 | $4,048.00 | 08/28/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).Note: Specify distances as indicated in table in paragraph (f)(6) of this section. (a) At the residential home front area, employee using the Genie aerial lift to remove old windows was exposed to 7620 Volts phase to ground overhead power lines while lifting the aerial lift and made contact with the conductor, as observed on or about April 29, 2020.
Translate