Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1471117.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $10,814.00
Current Penalty: $7,569.80
Issuance Date: 08/19/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 09/18/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/18/2020 | $7,569.80 | Serious | ||
| Penalty | Z: Issued | 08/19/2020 | $10,814.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: (a) On or about March 13, 2020 - DTR Insertion area, employees were exposed to struck-by hazards when the light curtain did not prevent clamp movement while operators were installing parts into the clamp fixture.
Translate