Violation Detail
Standard Cited: 19100219 F01 Mechanical power-transmission apparatus.
Inspection Nr: 1468027.015
Citation: 01004
Citation Type: Serious
Abatement Date: 05/18/2020 2
Initial Penalty: $7,422.00
Current Penalty: $4,453.20
Issuance Date: 04/15/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 05/06/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/06/2020 | $4,453.20 | 05/18/2020 | Serious | |
| Penalty | Z: Issued | 04/15/2020 | $7,422.00 | 05/18/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.219(f)(1): Gear(s) were not guarded by a complete enclosure or by one of the methods specified in 29 CFR 1910.219(f)(1)(ii) and (f)(1)(iii): a) Plant - On or about 03/04/20 and at times prior thereto, the gear on the side of the sheet extrusion/lamination line was not completely guarded. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).