Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1468027.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/18/2020 2
Initial Penalty: $7,422.00
Current Penalty: $4,453.20
Issuance Date: 04/15/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 05/06/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/06/2020 | $4,453.20 | 05/18/2020 | Serious | |
| Penalty | Z: Issued | 04/15/2020 | $7,422.00 | 05/18/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end, and projected more than one half the diameter of the shaft: a) Plant - On or about 03/04/20 and at times prior thereto a shaft in the sheet extrusion lamination line (lamination area)projected more that half diameter and was not guarded. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).