Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1467942.015
Citation: 01001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/08/2020
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 1032100
Contest Date:
Final Order: 08/13/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/08/2020 | $0.00 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection. Processing Plant - The 2019 written certification for the employer's "Energy Control Program" was not documented. Employees regularly lock out fish processing lines and are potentially exposed to the unintended release of stored energy types such as electrical, hydraulic, and high pressure air and oil.
Translate