Violation Detail
Standard Cited: 19260451 B02 General requirements.
Inspection Nr: 1467712.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/26/2020 5
Initial Penalty: $2,892.00
Current Penalty: $1,735.20
Issuance Date: 05/13/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 07/23/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/23/2020 | $1,735.20 | 05/26/2020 | Serious | |
| Penalty | Z: Issued | 05/13/2020 | $2,892.00 | 05/26/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(b)(2): Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and/or walkway was not at least 18 inches (46 cm) wide: a) This violation occurred on or about March 3, 2020, at a workplace located at 2101 Longmont Lane, Prosper, TX; where framer/subcontractor, who was working from a platform of 6 inches wide, was exposed to the hazard of falling to the ground below.
Translate