Violation Detail
Standard Cited: 19260753 D02 I Hoisting and rigging.
Inspection Nr: 1467324.015
Citation: 01002
Citation Type: Other
Abatement Date: 09/18/2020 2
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 08/24/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity:
Report ID: 0317300
Contest Date:
Final Order: 09/23/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/23/2020 | $13,494.00 | 09/18/2020 | Other | |
| Penalty | Z: Issued | 08/24/2020 | $13,494.00 | 09/18/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.753(d)(2)(i): Materials being hoisted were not rigged to prevent unintentional displacement. a) Delaware Memorial Bridge/Southbound Side Wilmington, DE - On or about February 28, 2020, the employer did not ensure that temporary links being disassembled from the bridge's tower were rigged to prevent unintentional displacement. A temporary link rigged with a chain fall and come-along was displaced, injuring an employee.
Translate