Violation Detail
Standard Cited: 19100254 D09 III Arc welding and cutting.
Inspection Nr: 1464259.015
Citation: 01006
Citation Type: Serious
Abatement Date: 09/11/2020 2
Initial Penalty: $9,446.00
Current Penalty: $4,723.00
Issuance Date: 08/17/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 09/17/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/17/2020 | $4,723.00 | 09/11/2020 | Serious | |
Penalty | Z: Issued | 08/17/2020 | $9,446.00 | 09/11/2020 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replaced: (a) On or about 2/20/2020 -260 Rainsville St NW, Rainsville, AL 35986, employees using a Miller Deltaweld 452 CV-DC Welder were exposed to electrical shock hazards because the ground return cable for the power source had exposed and frayed wiring.