Violation Detail
Standard Cited: 19260453 B02 IV Aerial lifts.
Inspection Nr: 1460908.015
Citation: 01001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $7,422.00
Current Penalty: $3,711.00
Issuance Date: 02/20/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0112600
Contest Date:
Final Order: 03/17/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/17/2020 | $3,711.00 | Other | ||
| Penalty | Z: Issued | 02/20/2020 | $7,422.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.453(b)(2)(iv): Employees did not always stand firmly on the floor of the basket, and shall not sit or climb on the edge of the basket or use planks, ladders, or other devices for a work position: 46 Middle St., Hadley, MA: on or about February 4, 2020 2 employees were observed working from a raised aerial lift who were putting their feet on the rails and or roof deck for leverage while they were sheathing the roof of this building. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).