Violation Detail
Standard Cited: 19101026 D02 III
Inspection Nr: 1460661.015
Citation: 01005
Citation Type: Other
Abatement Date: 05/27/2020 2
Initial Penalty: $7,711.00
Current Penalty: $4,626.60
Issuance Date: 04/09/2020
Nr Instances: 1
Nr Exposed: 50
Related Event Code (REC):
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 05/05/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/05/2020 | $4,626.60 | 05/27/2020 | Other | |
| Penalty | Z: Issued | 04/09/2020 | $7,711.00 | 05/27/2020 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.1026(d)(2)(iii): If monitoring reveals employee exposures to be at or above the action level, the employer shall perform periodic monitoring at least every six months. a) Serco Chesapeake Facility: On about 02/04/2020, the employer did not perform periodic monitoring for stainless steel stick welding operations at least every six months, as a result continued to possibly expose employees above the action level. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate