Violation Detail
Standard Cited: 19100179 N02 III Overhead and gantry cranes.
Inspection Nr: 1458487.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $13,359.00
Current Penalty: $7,528.64
Issuance Date: 03/05/2020
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 03/26/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/26/2020 | $7,528.64 | Serious | ||
| Penalty | Z: Issued | 03/05/2020 | $13,359.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.179(n)(2)(iii): The employer did not ensure that care was taken to prevent the sling and components from contacting obstacles. On or about 1/27/2020, at the Wheelabrator equipment in the facility located at 416 N. Clarendon Ave, Scottdale, GA: Employees operated a 15-ton Ace Industries Inc. overhead crane, with a chain sling and dog clamp attachment, to load steel beams in length over 51 feet and weight over 2585 pounds onto a conveyor system. The chain sling and dog clamp attachment did not clear the steel beam while being raised, thereby exposing the employees to struck-by and/or caught-under hazard.