Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1457808.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/18/2020
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 05/29/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/29/2020 | $0.00 | Serious | ||
| Penalty | Z: Issued | 05/18/2020 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: On or about January 23, 2020, and at times prior thereto; at the Stripping Line Department, the employer did not ensure the Stripper Power Junction Box was covered exposing employees to electrical shock hazards.
Translate