Standard Cited: 19100303 G01 General.
Inspection Nr: 1457329.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,940.00
Current Penalty: $6,940.00
Issuance Date: 03/04/2020
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 04/01/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/04/2020 | $6,940.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: a. Fulton County Processing, LTD, Delta, OH, Slitter 2 Line: On or about January 22, 2020, the employer did not provide sufficient access and working space to a 480 electrical volt panel (CD1) to permit the ready and safe operation and maintenance of equipment. b. Fulton County Processing, LTD, Delta, OH, Slitter 2 Line: On or about January 22, 2020, the employer did not provide sufficient access and working space to a 480 volt electrical panel (CD2) to permit the ready and safe operation and maintenance of equipment.