Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1457117.015
Citation: 01001A
Citation Type: Other
Abatement Date: 02/21/2020 2
Initial Penalty: $12,145.00
Current Penalty: $6,000.00
Issuance Date: 02/14/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity:
Report ID: 0830600
Contest Date:
Final Order: 03/31/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/31/2020 | $6,000.00 | 02/21/2020 | Other | |
| Penalty | Z: Issued | 02/14/2020 | $12,145.00 | 02/21/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) Third, fourth and fifth floor Fan Power Boxes: On or about January 8, 2020, and at times prior, workers were exposed to electrical shock and electrocution hazards each time they accessed energized 277 VAC enclosures to install a circuit monitoring device. Abatement Note: Abatement certification and documentation are required for this item (see enclosed Certification of Corrective Action Worksheet).
Translate