Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1454001.015
Citation: 01003C
Citation Type: Serious
Abatement Date: 04/29/2020 2
Initial Penalty: $4,048.00
Current Penalty: $0.00
Issuance Date: 03/13/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 03/24/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/24/2020 | $0.00 | 04/29/2020 | Serious | |
| Penalty | Z: Issued | 03/13/2020 | $4,048.00 | 04/29/2020 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).Note: Specify distances as indicated in table in paragraph (f)(6) of this section. On or before December 30, 2019, located on the east side of Tyler Technologies, Inc. facility, employees were installing metal siding onto an exterior commercial structure while operating a telescopic boom lift within 10 feet of a 7200V line overhead power line.
Translate