Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1453651.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/04/2020 2
Initial Penalty: $10,409.00
Current Penalty: $4,510.50
Issuance Date: 02/13/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 03/10/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/10/2020 | $4,510.50 | 03/04/2020 | Serious | |
| Penalty | Z: Issued | 02/13/2020 | $10,409.00 | 03/04/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a) On or about 1/3/2020 the employer did not conduct periodic inspection of the energy control procedures annually, for equipment such as but not limited to; Press 4 Straightener (model # 8-20).