Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1452023.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 03/02/2020 2
Initial Penalty: $5,735.00
Current Penalty: $3,664.80
Issuance Date: 02/04/2020
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 02/25/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/25/2020 | $3,664.80 | 03/02/2020 | Serious | |
| Penalty | Z: Issued | 02/04/2020 | $5,735.00 | 03/02/2020 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o). On 12/19/2019, at the Sandersville location, belts and pulleys that were on floor levels were not guarded at the 50 in. line in the production area.
Translate