Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1452023.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 03/02/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/04/2020
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 02/25/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/25/2020 | $0.00 | 03/02/2020 | Serious | |
| Penalty | Z: Issued | 02/04/2020 | $0.00 | 03/02/2020 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle. On 12/19/2019, at the Sandersville location, at the 50 in. line, the employer did not ensure the Beck Shear on the line was adequately guarded leaving the point of operation exposed and accessible to employees.
Translate