Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1450863.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $5,205.00
Current Penalty: $3,123.00
Issuance Date: 05/14/2020
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 1
Report ID: 0420600
Contest Date:
Final Order: 06/02/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/02/2020 | $3,123.00 | Serious | ||
| Penalty | Z: Issued | 05/14/2020 | $5,205.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a. On or about 12/12/2019, at the rear of the warehouse - employees were exposed to emergency and fire related hazards, in that, the designated exit doors were closed and locked and had a door knob and a dead bolt.