Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1448459.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 02/18/2020 2
Initial Penalty: $7,577.00
Current Penalty: $5,000.00
Issuance Date: 01/13/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 02/07/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/07/2020 | $5,000.00 | 02/18/2020 | Serious | |
| Penalty | Z: Issued | 01/13/2020 | $7,577.00 | 02/18/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in activities covered by this section. a) Mountain States Rosen, 920 North 7th Avenue, Greeley, CO 80631: On or before, December 3, 2019, the employer did not ensure that procedures were developed, documented, and utilized for equipment involving multiple energy sources, such as but not limited to the V-MAG Machine and proportioning attachment that was pneumatically powered. This condition exposed employees to amputation, stuck-by, and electrical hazards.