Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1445165.015
Citation: 02001
Citation Type: Other
Abatement Date: 04/20/2020 2
Initial Penalty: $1,082.00
Current Penalty: $1,082.00
Issuance Date: 03/25/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0521700
Contest Date:
Final Order: 04/20/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/25/2020 | $1,082.00 | 04/20/2020 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Production Line 1 - On or about November 15, 2019, the employer failed to conduct a periodic inspection of the energy control procedure for the chain lug pan conveyor, at least annually, as required by the standard. Maintenance employees were required to perform service and/or maintenance tasks, and thereby exposed to hazards associated with the unexpected energization and/or startup of the equipment.