Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1442198.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 02/27/2020 2
Initial Penalty: $2,313.00
Current Penalty: $1,200.00
Issuance Date: 01/31/2020
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 1
Report ID: 1032500
Contest Date:
Final Order: 03/10/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/10/2020 | $1,200.00 | 02/27/2020 | Serious | |
| Penalty | Z: Issued | 01/31/2020 | $2,313.00 | 02/27/2020 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were used where run through holes in walls, ceilings, or floors: (a) On or about October 30, 2019, and at times prior thereto, the employer used flexible wiring to substitute for fixed wiring and had it attached and running through holes in the walls. NOTE: Abatement certification IS required for this item