Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1438718.015
Citation: 01002
Citation Type: Serious
Abatement Date: 01/07/2020 2
Initial Penalty: $3,789.00
Current Penalty: $2,273.40
Issuance Date: 12/18/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 02/25/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/25/2020 | $2,273.40 | 01/07/2020 | Serious | |
| Penalty | Z: Issued | 12/18/2019 | $3,789.00 | 01/07/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) On or about October 9, 2019, in the Fertilizer Department, employees performed maintenance on an inadequately guarded belt and pulley system that was approximately four feet eight inches from the ground.