Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1437596.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/23/2019
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC):
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 01/23/2020
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 12/23/2019 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Throughout the hospital, where the general energy control procedure was not periodically inspected to ensure that the requirements of this standard were being followed. As observed on 10/11/2019.
Translate