Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1436905.015
Citation: 01004
Citation Type: Serious
Abatement Date: 12/03/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/29/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0420300
Contest Date:
Final Order: 11/22/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/29/2019 | $0.00 | 12/03/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): FRC East, Bldg. Askar Shop #69140, Safe Site B-10: On or about October 8, 2019, the attempted servomotor replacement for the LSIS 22 resulting in the unintended release of storage energy from the overhead Lift Cage due to the established energy control procedures not including the specific energy isolating devices that were needed to control the hazardous energy. Authorized employees were not made aware of the specific isolating devices to be used in order to isolate the equipment from the energy sources, therefore, LOTO devices could not be affixed in accordance with �1910.147(d)(4). ABATEMENT DOCUMENTATION REQUIERD
Translate