Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1431011.015
Citation: 02001
Citation Type: Other
Abatement Date: 11/13/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/17/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0418300
Contest Date:
Final Order: 11/12/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2019 | $0.00 | 11/13/2019 | Other | |
| Penalty | Z: Issued | 10/17/2019 | $0.00 | 11/13/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: (a) On or about 09/16/2019 - Fabrication Department, no written certification was maintained for periodic inspections of the energy control procedures performed for the Niagara mechanical power press punch machine #221.
Translate